Discussion on the specific precautions for the use and maintenance of sew reducer

On the specific precautions for the use and maintenance of sew reducer

in the current society, with the continuous improvement of industrialization level, people can choose more industrial products with pre evolution, which makes modern people’s material life richer. The continuous acceleration of industrialization is inseparable from the effective utilization of advanced industrial and living equipment. Sew reducer is not only the most potential mechanical reducer equipment, but also an indispensable auxiliary equipment for industrial process production. Many people do not understand the specific precautions for the use and maintenance of sew reducer. Here is a comprehensive analysis of these situations, hoping to bring you useful suggestions.

before using sew reducer, we should carefully clean the installation shaft. If there are dirt and stains on the installation shaft, we need to clean it all. In addition, the service temperature of sew reducer should be between 0 ~ 40 ℃, not too high or too low. When operating the sew reducer, we need to replace the plug at the highest position with the exhaust plug to ensure that the sew reducer can discharge the gas in time during operation, so as not to affect the normal use of the equipment. Among

and

, the most noteworthy thing is that sew reducer should be installed on a flat and shock-absorbing support structure, not on an unstable structural plane, otherwise it is easy to cause equipment damage and cause great losses to us. In addition, it should be noted that the belt pulley, coupling or pinion cannot be hit with a hammer, otherwise the bearing and shaft will be seriously damaged, which will bring us unnecessary trouble. After the installation of sew reducer, we should carefully check whether the equipment is installed flexibly, and conduct no-load use test first. It can be put into use only when the operation is normal.

we should also check the oil level of sew reducer at all times. If sew reducer is used for the first time, the lubricating oil needs to be replaced after the sew reducer runs for 300 ~ 400 hours. After that, the lubricating oil shall be replaced every 1500 ~ 2000 hours, so as to ensure that sew reducer is in the best operation state.

and

in this way, the use and maintenance of sew reducer are multifaceted, which requires us to carefully understand and master. Only by carefully implementing these matters can sew reducer be used most reasonably.

CAMEL Transmission Machinery Factory is a professional supplier,distributor and manufacturer of gear reducers and related accesories. including rotary reducer,worm gearbox, servo-gearbox, planetary gearboxes,planetary gear reducer, helical gear reducers,planetary gearbox,right angle gear reducer, gear reduction,gear motors, electrical motors,DC motors, DC gear motor,dc gearedmotors,AC gear motor,AC motors, servo motors,servomotor, bearings, spur gear,helical gear,bevel gear,worm gear,planetary gear, couplings, oil seals, belts, chains, etc.If you have any need, please feel free to contact CAMEL: Whatsapp:8618015057952 SEW Gearmotor Guomao parallel shaft gearbox